The project generally consists of the replacement and renewal of the existing rooftop HVAC systems at York Civic Centre. The work includes the removal of two existing make-up air units (MAU-1 and MAU-2) and six existing
OpenCity of Toronto — Corporate Real Estate ManagementToronto, OntarioCloses in 6 days
Share
Aggregated notice from City of Toronto (TOBids). Listed here for discovery with a link back to the original — Tendering.ca is not the submission platform for it. Bids must be submitted at the source.
View original notice ↗
