TBU 11 Renovations – Government of Canada Building – Regina, Saskatchewan
ClosedAggregated notice from CanadaBuys (Government of Canada). Listed here for discovery with a link back to the original — Tendering.ca is not the submission platform for it. Bids must be submitted at the source.
View original notice ↗This project involves the comprehensive addition and mechanical renovation of the TBU-11 facility in Regina, Saskatchewan. The scope of work encompasses both demolition and new construction activities, as well as significant upgrades to building systems and site infrastructure. Key Components: 1. Building Demolition and Addition • Partial demolition of the existing TBU-11 structure to facilitate the construction of a new building addition. • Careful sequencing to ensure minimal disruption to ongoing operations. 2. Domestic Hot Water System • Provision of a temporary domestic hot water system to maintain service continuity during construction. • Installation of a new permanent hot water supply and recirculation system upon project completion. 3. Site Works • Site clearing, demolition, and grading to prepare for new construction and landscaping. • Development and upgrading of site access roads, sidewalks, and pavement structures to enhance both pedestrian and vehicular movement. 4. Site Infrastructure • Installation of site lighting fixtures to improve safety and visibility. • Erection of fencing and gates for enhanced security and controlled access. • Connection to municipal water services to support building operations. 5. Fuel Tank Systems • Provision of a temporary fuel tank to ensure uninterrupted fuel supply during construction. • Relocation and reinstallation of the existing fuel tank, including all associated piping and accessories. 6. Sanitary System Replacement • Replacement of the basement sanitary line while maintaining continuous operation of the steam heating plant. • Installation of new underground sanitary piping beneath the existing slab, including floor drains, funnel drains, and trench drains. 7. Boiler Blowdown System • Removal and replacement of the blowdown tank. • Sequencing of work to ensure that at least one boiler remains operational at all times. 8. Drainage Modifications • Routing of roof drainage to improve water management. • Installation of a lift station in the sub-basement and re-sloping of trench drainage to optimize flow. 9. Sanitary System Upgrades • Piping of all sanitary lines in the sub-basement. • Installation of a temporary holding tank for domestic drainage to maintain system functionality during construction. 10. External Sanitary Connection • Installation of a new sanitary sewer line from the existing manhole…
Subscribe to view the full scope, documents, Q&A, and addenda. One flat plan, $25/month, every feature included.
Get startedSubscribe to view the document list and downloads. One flat plan, $25/month, every feature included.
Get startedPublished
Jun 29, 2026 12:00 AM
Questions deadline
—
Closing
Jul 16, 2026 4:00 PM
Reference
M5000-25-3791/A
Project type
Consulting / Professional Services

