Request for Expression of Interest for Liri Valley Apartments and Rowhouses
OpenAggregated notice from CanadaBuys (Government of Canada). Listed here for discovery with a link back to the original — Tendering.ca is not the submission platform for it. Bids must be submitted at the source.
View original notice ↗???????English Description DEFENCE CONSTRUCTION CANADA (DCC) – HAAED99_CN86264 – Liri Valley Apartments and Rowhouses at CFB Edmonton, AB ??????? Defence Construction Canada (DCC) invites general contractors to express their interest in providing all labour, materials, equipment necessary to build and commission six rowhouse buildings of 4 units each, and two apartment 6-plexes at CFB Edmonton, AB. Work includes exterior work, parking lot and utility connections as well as structural, mechanical, and electrical work. This Request for Expression of Interest (RFEOI) is the first step of a two-step solicitation process, the second step being the Tender Phase. Only general contractors that have expressed their interest through the Electronic Bidding System prior to the closing date and time of this RFEOI will be invited to submit a proposal at the second stage. Only submissions received in accordance with the requirements of the Electronic Bidding System will be considered. Only the general contractors who will have responded to this RFEOI will be invited to submit a bid during the Tender Phase. DCC reserves the right to terminate this solicitation at the end of the RFEOI. As part of Canada’s commitment to maximize the participation of Indigenous Businesses, bidders are advised that this solicitation includes an Indigenous Benefits Plan (IBP). The Contractor will have to include Indigenous businesses (or eligible joint ventures) as subcontractors or suppliers to this project. Further details will be provided in the Tender phase. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA). Project background The aim of the project is to deliver the construction of apartments and rowhouses on Liri Valley road in the RHU area at 3 Canadian Division Support Base Edmonton as part of the Canadian Forces Housing Agency (CFHA) -Residential Portfolio Capital Investment Plan (RPCIP) Phase 1 program. The intended scope of this work will include: Apartments: Two apartment 6-plexes (12 RHUs) including parking lot and utility connections. Rowhouses: Six Rowhouse Buildings of 4 units each (24 RHUs) including exterior work and utility connections. Implementation including construction and commissioning. The design will meet sustainability, energy efficiency, GHG reduction, water conservation, and resiliency targets through internal performance requirements. Documents Technical plans and specifications are not available during this RFEOI and will be provided during the Tender Phase; however, the Standard Construction Contract Documents for Electronic Bidding, DCL 250E, are available…
Subscribe to view the full scope, documents, Q&A, and addenda. One flat plan, $25/month, every feature included.
Get startedSubscribe to view the document list and downloads. One flat plan, $25/month, every feature included.
Get startedPublished
Jul 23, 2026 12:00 AM
Questions deadline
—
Closing
Aug 11, 2026 4:00 PM
Reference
HAAED99_CN86264
Project type
Consulting / Professional Services
Sign in to express interest — we'll notify the buyer that you want to be considered.
Get started
